Repsol Sinopec Resources UK has handed in decommissioning plans for the Saltire platform in the North Sea.
The proposals, handed in to regulator OPRED, cover removal of the topsides, a wellhead protection unit and associated pipeline. The platform jacket is subject to separate plans.
Repsol Sinopec has set out a planned removal window for the Saltire topsides, which weigh more than 12,000 tonnes, starting from Q2 2027, though this is subject to change.
Read the full story here.
Photo Credit: Energy Voice.
